Can I schedule content to publish at a later date?
Publishing can be triggered manually, through a workflow step, or on an automated schedule. Publish and expiration dates can be added to all content. If an expiration date is added, the user also has the option of selecting an archive folder that the page should be moved to upon expiration. This can be done at the content item level and at the collection (folder) level.
Last modified on Tue, 19 Dec 2006 15:50:06 -0500
Top / Previous / Next / Up / Table of Contents